20 May 2018

Halfway Point the Getaway

We are halfway through our sewing retreat getaway.  Were we are staying is very quiet this time of year but we a close enough to restaurants and shops if we need to be go out.  The house is perfect for our needs there is an island bench for all important fabric cutting (and occasionally food prep) and a big long table that we can spread out on when we need to and the lounge is lovely to sit in an sew in from of the TV watching a movie or royal wedding.

We’ve sewed A LOT I think yesterday I stitched from 7.30am  until 10.30 pm with breaks for shower, food and the Royal Wedding.

My plan was to work on a different project each day.

Row by Row

Friday was my row by row. I finished the resew of the florist shop row and stitched the rows so far together.  It’s looking good.  3 more rows to go and there is no way it will be finished by June, but hey that’s fine.  The real job has been really hitting hard lately and some nights I just can’t bring myself to sew.  I’ll finish the rows when I can and then we will get the patterns up.

Pretty Circle Game

I was a bit behind on Circle Game having not finished last months block with all my row by row renewing that needed to be done but I am almost up to date now.  The 2nd block from this month is about halfway together.

Plan for Today

Well today I might start a new project and then maybe move on to Delilah.  I packed some fabrics for Glitter (another Jen Kingwell’s design and I might just cut a few blocks out.  I admit to having a couple of Jen Kingwell’s quilts at this stage.  I just cut a few blocks when I feel like it and will then gradually stitch them together.  Florence is in a similar state as is Daisy Do.  There is no requirement for these quilts to be finished they will just be waiting when I want to start stitching them.  These are pretty much 1 block quilts which I think is perfect for this style of slow stitching.





07 May 2018

Girls Getaway

This time last year over a sewing day, 3 girls made a plan to do a sewing road trip to celebrate 2 of us reaching 0 milestones.  Mainly due to my work being nuts and having no backup whatsoever and needing to fit in with everyone else’s family commitments (including my own) the extravaganza has been whittled down to 5 nights down the Coast extending a weekend.

I’ve started narrowing down (well trying to) the projects I’m going to take.  I’m sure I will weaken and decide to take more over the next week and a bit but I’m trying to stick to 4.  As it is there is going to be more sewing stuff than food and clothing going into the car.  They tried to tempt me with a joint project but I was strong.  I really don’t need to start anything new at this stage.

Sue has sent a list of food places to eat and I don’t think we have enough meals to fit them all in.  Someone mentioned taking DVD’s just in case TV is crap as I don’t watch much free to air TV that is a distinct possibility.  My Kindle is stacked with books and I must remember to put in my bluetooth headphones in case I need to listen to some books.

I just got my latest stash builder bundle from Amitie so that has been added to the pile to take.

The projects are:



  • Start Golden Days  all the backgrounds selected and I should eI casily get through the first two blocks to catch up.  
  • Month 5 of Pretty Circle game is all cut out ready to stitch.  
  • Row by Row - I have to restitch one more row this week o I can get the bottom 2/3’s of the quilt stitched together.  
  • The first 5 months of Delilah is cut in prep for hand stitching.  
  • Last Years BOM is going so I can baste it.

I can’t tell you how much I am looking forward to going and getting away from work which is really getting to me at the moment.  I need to distress just have to get through 6 weeks work in 2 week over the next little while.